JUST HOW TO INSTALL A BATH TUB YOURSELF: REMOVING AS WELL AS REPLACING.

Just How to Install a Bath Tub Yourself: Removing as well as Replacing.

Just How to Install a Bath Tub Yourself: Removing as well as Replacing.

Blog Article

Contact Us Now

The content listed below involving A Step-by-Step Guide to Installing a Bathtub is relatively entertaining. Read it yourself and decide what you think of it.


How to Install a Bathtub: Install an Acrylic Tub and Tub Surround
Mounting a bathtub isn't precisely brain surgery, but it does need solid plumbing, woodworking, and in some cases, tiling abilities. Changing an old bathtub with a new one is likewise a reasonably difficult job. If the old bathtub is conveniently available, the job can relocate quickly; if you need to open up a wall surface to remove the old tub as well as place the new tub, the job is a lot harder. In either case, the project is within a house handyman's abilities, although you will certainly need a helper to move out the old tub as well as embeded in the brand-new one. Make sure you have qualified on your own for the work as well as fit trying it. As opposed to hiring a contractor to take control of a halfway-completed project, it is much better to consider utilizing one before you start. Opportunities are you may require an expert plumber to make tube connections.
This post will assist you set up a new bathtub in your shower room if you have currently acquired a brand-new bathtub and also do not require to transform the setup of your previous supply of water pipes.
Your tools as well as material checklist ought to make up the following:
  • New Bath tub

  • Hammer

  • Pipeline Wrenches

  • Prybar

  • Shatterproof glass

  • Level

  • Pliers

  • Adjustable Wrench

  • Putty Knife

  • Screwdriver

  • Cold Chisel

  • Tape Measure

  • Pipe Caps


  • Removing Old Taps


    If you require to change old faucets with new ones as a part of your installation, then the first thing you need to do is separate the water system. After doing so, turn on the taps to drain pipes any type of water staying in the system. The process of getting rid of the existing faucets can be rather problematic as a result of the limited gain access to that is frequently the case.
    Make use of a basin wrench (crowsfoot spanner) or a tap device to undo the nut that connects the supply pipelines to the taps. Have a cloth all set for the staying water that will come from the pipes. As soon as the supply pipelines have been removed, make use of the very same tool to loosen the nut that holds the faucets onto the bath/basin. You will certainly need to stop the solitary taps from transforming during this process. When the taps have actually been eliminated, the holes in the bath/basin will certainly need to be cleaned of any kind of old sealing substance.
    Before moving on to fit the new faucets, contrast the pipe links on the old taps to the brand-new taps. If the old taps are longer than the brand-new faucets, then a shank adapter is needed for the new faucets to fit.

    Fitting New Touches


    If the tails of the new faucets are plastic, then you will certainly need a plastic port to prevent damages to the thread. One end of the port fits on the plastic tail of the tap as well as the various other end supplies a connection to the existing supply pipelines.
    If you need to fit a monobloc, after that you will call for reducing couplers, which links the 10mm pipeline of the monobloc to the conventional 15mm supply pipeline.
    Next, place the tap in the installing opening in the bath/basin guaranteeing that the washing machines are in location in between the tap as well as the sink. Secure the tap in position with the manufacturer supplied backnut. As soon as the tap is firmly in place, the supply pipes can be connected to the tails of the faucets. The taps can either be attached by using corrugated copper piping or with typical faucet ports. The previous type needs to be connected to the faucet ends first, tightening up just by hand. The supply pipes can later be attached to the various other end. Tighten both ends with a spanner after both ends have actually been attached.

    Installing the Tub


    Utilizing both wooden boards under its feet, put the tub in the called for position. The wooden boards are practical in equally spreading the weight of the bathtub over the area of the boards as opposed to concentrating all the weight onto four small points.
    The following objective is to ensure that the bathtub is leveled all round. This can be achieved by checking the level and also adjusting the feet on the tub till the spirit level reads degree.
    To mount taps, fit the bottom of the outermost adaptable tap adapter to the appropriate supply pipeline by making a compression join; after that do the very same for the various other faucet.
    Activate the water supply and check all joints as well as new pipework for leakages as well as tighten them if needed. Fill up the tub as well as additionally check the overflow outlet and the typical electrical outlet for leakages.
    Ultimately, fix the bath paneling as explained in the maker's instruction manual. Tiling as well as sealing around the bath tub needs to wait till the bath tub has actually been made use of at the very least when as this will certainly resolve it into its final setting.

    Getting ready for the Installation


    Firstly, the supporting structure provided with the bath ought to be fitted (if required) according to the manufacturer's instructions. Next, fit the faucets or mixer to the bath tub. When suitable the faucet block, it is very important to ensure that if the tap comes with a plastic washing machine, it is fitted in between the bathroom and also the faucets. On a plastic bath, it is also sensible to fit a sustaining plate under the faucets system to avoid strain on the bath tub.
    Fit the flexible tap connectors to the bottom of the two faucets making use of 2 nuts and also olives (occasionally provided with the bathtub). Fit the plug-hole outlet by smearing mastic filler round the sink outlet hole, and then pass the electrical outlet via the hole in the bath. Use the nut provided by the maker to fit the plug-hole. Take a look at the plug-hole outlet for an inlet on the side for the overflow pipeline.
    Next off, fit the end of the adaptable overflow pipeline to the overflow outlet. Afterwards, screw the pipeline to the overflow face which ought to be fitted inside the bath. See to it you use every one of the provided washers.
    Connect the catch to the bottom of the waste electrical outlet on the tub by winding the thread of the waste electrical outlet with silicone mastic or PTFE tape, and also screw on the trap to the outlet. Attach all-time low of the overflow tube in a similar manner.The bathroom must now prepare to be fitted in its last setting.

    Tiling Around the Bathtub


    In the location where the bath fulfills the ceramic tile, it is necessary to secure the joins with a silicone rubber caulking. This is necessary as the fitting can relocate enough to fracture a stiff seal, causing the water to pass through the wall between the bathroom as well as the tiling, leading to difficulties with moisture and also feasible leaks to the ceiling listed below.
    You can choose from a range of coloured sealants to assimilate your components as well as installations. They are offered in tubes and also cartridges, as well as can sealing spaces up to a size of 3mm (1/8 inch). If you have a bigger space to fill up, you can load it with twists of drenched newspaper or soft rope. Bear in mind to always fill the tub with water before securing, to allow for the motion experienced when the tub remains in use. The sealant can fracture fairly very early if you do not take into account this motion prior to sealing.
    Additionally, ceramic coving or quadrant floor tiles can be used to edge the bathroom or shower tray. Plastic strips of coving, which are easy to use and also cut to dimension, are additionally conveniently available on the marketplace. It is suggested to fit the tiles making use of waterproof or waterproof sticky and also grout.

    A Step-by-Step Guide to Installing a Bathtub


    Is your bathtub looking a bit dated lately? Believe it or not, installing a new one is a project you can do yourself. Whether your bathtub is broken or doesn’t fit in with your current bathroom’s design, you can fix it without having to hire a contractor or paying labour costs.



    But, beyond saving money, there are other benefits of installing your own bathtub. When you do this project yourself, you can customise every step of the process. You can also make sure the finished product looks exactly the way you want it to.



    This DIY project is quite involved, but by doing some research, preparing your bathroom and using the right equipment, it is definitely one you can take on. This guide will help you understand the technical procedures behind installing a new bathtub.


    Remove the Existing Bathtub


    To remove the old bathtub, you will need to turn the water supply off before you start any work. After you turn the water off, there will likely still be some water left in your plumbing system, which you can remove by turning on a faucet below the level of the bathtub. Once the water stops running, you are ready to start working.



    The easiest way to remove the tub is to remove the faucet, handles and other piping and then pull the tub out from the wall. If this doesn’t work in your situation, you will need to remove part of the wall, remove the piping and then slide the tub out.


    Choose the Right Bathtub


    The ideal way to replace your bathtub is to find one that has the exact dimensions and has the drain and faucet on the same side as your old one. This way, it will fit in the same place and you won’t have to change the piping system in your bathroom. Choose a tub that matches your home’s decor and fits with the style of the bathroom.


    Install the Plumbing and Ledger Board


    You can purchase a tub drain kit at a hardware store which will have all the pieces you will need for your new tub’s plumbing. Follow the instructions that came with the kit to install the plumbing in the new tub and then take measurements to make sure the plumbing in the tub will align with the plumbing in your bathroom. If it doesn’t, now is the time to make necessary adjustments.



    Some bathtubs need a ledger board that is installed on the wall behind the tub to help support it. If your new bathtub requires one, the directions that came with it will tell you how high it should be installed. If your old bathtub had a ledger board, and it is still in good condition, you can adjust its height to match the new bathtub.


    Install the Bathtub


    When the plumbing and ledger board are ready, you can install the new bathtub. Carefully lower it into the space, being careful not to damage the tub, wall, plumbing or ledger board. Since bathtubs are very heavy and you will need to line the tub up exactly, it is wise to have someone help you with this step.



    Once the tub is in place, it needs to be perfectly level, so use a bubble level instead of estimating how level the tub is. Put the level on the top edge of the tub, not the bottom on the inside, since many tubs are designed with a sloped bottom.



    If the bathtub isn’t level, adjust the ledger board and shift the tub until it is. When it is level, use screws to attach the tub to the wall studs. Most bathtubs have pre-drilled holes in the upper flange, so use these but do not over tighten the screws.


    Hook up the Plumbing


    Now that the bathtub is installed, it needs to be attached to your plumbing system. First, install the shoe fitting under the tub and drain pipe, then the overflow pipe and then the drain flange. Your tub plumbing kit will include specific instructions on how to install these pieces.


    Install the Bathtub Surround


    A bathtub surround will protect the walls around the tub from water damage and can give your new bathtub a more finished look. To install one, make sure the wall is completely clean and dry so that the adhesive will be able to hold the surround securely. Then, measure the surround and mark the same dimensions on the wall above the tub.



    Following the directions that came with the surround adhesive, apply it to the wall. Press the surround against the wall on top of the adhesive and then pull it away for about three minutes to activate the adhesive, then apply the surround again. Keep in mind that this is the most common way to use an adhesive, but you should check the instructions on the package for any special steps.



    If there is any excessive adhesive around the sides of the surround, you can use mineral spirits to remove it. Then use masking tape to hold the surround panels in place until the adhesive is dry. Using silicone, seal all the cracks between the surround panels and the gap between the bottom of the panels and the top of the bathtub.



    If you want to install tile above your bathtub, instead of a bathtub surround, the process will be very similar. But, you will need to measure and cut tiles and install each one individually, using tile spacers to make sure they are evenly spaced. You will then use grout to fill in the spaces between the tiles.

    https://www.hss.com/blog/bathroom/a-step-by-step-guide-to-installing-a-bathtub/


    How to Install a Bathtub: Install an Acrylic Tub and Tub Surround

    As a fervent person who reads on How to Install a Bathtub, I think sharing that editorial was a smart idea. Appreciated our piece of writing? Please share it. Help somebody else locate it. We treasure reading our article about How to Install a Bathtub.



    This Page

    Report this page